HS-5K Residential Energy Storage Installation Guide
This guide covers installation and commissioning of the EVX HS-5K residential energy storage system.
Safety Instructions
- Isolate the grid before installation and display warning signs.
- Do not store battery modules above 85% humidity.
- Wear insulated gloves and use insulated tools.
High voltage: battery stack voltage can reach 400V.
Before Installation
| Item | Requirement |
|---|---|
| Location | Ventilated, dry, away from direct sunlight |
| Temperature | -10°C to 45°C |
| Wall load | ≥ 120kg |
Installation Steps
- Fix and level the wall bracket.
- Mount the battery and inverter.
- Connect the ground cable.
- Connect PV, battery and load cables.
- Check terminal torque before power-on.
Troubleshooting
For E03, check the battery communication cable. E07 usually indicates abnormal grid voltage.